Posted by: hakim_saab January 20, 2013
नेपालमा लोडसेडिंग हटाउन NRN हरूले रु 1 अर्ब संकलन गर्यो रे
Login in to Rate this Post:     0       ?        
Yo sab fajul ko natak ho. Unless we build a reservoir based mega project, we'll continue face load shedding in the dry months. This 5MW project will barely produce 1Mw in the winter. By 2017 we'll be wasting billions of KW in the summer but we'll still face 8 hrs of loadshedding in the winter if they only build run of the river projects
Read Full Discussion Thread for this article