Posted by: coolkanchho March 1, 2007
Login in to Rate this Post:
0
?
Can anyone plz help me through this? I need to generate the graph from the data given below.
Days 1% 10% 20%
0day 6.2±0.9 5.115±0.085 4.93±0.04
5 days 5.445±0.155 4.875±0.025 4.855±0.045
7days 4.73±1.07 4.355±0.145 4.84±0.13
14 days 5.1±1.31 3.555±0.075 4.65±0.06
21days 5.34±1.45 3.15±0.11 4.585±0.005