Posted by: Kiddo February 26, 2013
Login in to Rate this Post:
0
?
@Dcop
I wasn't saying that they are trying to build it in phases. I thought the plan was to build it for 900 MW and later could be increased.
I think it is important to mention, a fact that I missed, that we are talking about RoR and Storage type projects; two different projects. That means, there's no "increasing" the power like you stated.
The problem I have is with the reports that claim 4000MW capcity. That's a huge claim and I say if we utilze the entire head we might come close to that; in practicality it might not be that high. But it still deserves to be looked. Do we have any published report that estimates the capability of a storage type unit?
I wasn't saying that they are trying to build it in phases. I thought the plan was to build it for 900 MW and later could be increased.
I think it is important to mention, a fact that I missed, that we are talking about RoR and Storage type projects; two different projects. That means, there's no "increasing" the power like you stated.
The problem I have is with the reports that claim 4000MW capcity. That's a huge claim and I say if we utilze the entire head we might come close to that; in practicality it might not be that high. But it still deserves to be looked. Do we have any published report that estimates the capability of a storage type unit?